Please use this identifier to cite or link to this item:
http://nopr.niscpr.res.in/handle/123456789/10070| Title: | Microstructure of 2 and 28-day cured Portland limestone cement pastes |
| Authors: | Sezer, Gözde İnan Çopuroğlu, Oğuzhan Ramyar, Kambiz |
| Keywords: | Limestone;clinker;hardened cement paste microstructure |
| Issue Date: | Aug-2010 |
| Publisher: | CSIR |
| Abstract: | In this study, microstructures of limestone cement pastes cured for 2 and 28 days are investigated. For this purpose, limestone and clinker are separately ground in a ball-mill until obtained a given constant 32 µm sieve residue. The gypsum is kept constant as 5% by weight of cement. Cement pastes with 0.5 water/binder ratios and 0, 6, 35% limestone/clinker ratios are prepared. After 2 and 28 days standard curing, ESEM investigations are carried out on these specimens. It is found that hydration products are accumulated around limestone particles. In 2 days, compared to the control specimen, pore percentages of cements containing 6% limestone are decreased whereas pore percentages of cement pastes containing 35% limestone are increased. The difference between porosities of the control paste and limestone cement paste is decreased at 28 days. |
| Page(s): | 289-294 |
| ISSN: | 0975-1017 (Online); 0971-4588 (Print) |
| Appears in Collections: | IJEMS Vol.17(4) [August 2010] |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| IJEMS 17(4) 289-294.pdf | 3.71 MB | Adobe PDF | View/Open |
Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.