Please use this identifier to cite or link to this item:
http://nopr.niscpr.res.in/handle/123456789/19402Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Chiu, Yuan-Shyi Peter | - |
| dc.contributor.author | Lin, Hong-Dar | - |
| dc.contributor.author | Cheng, Feng-Tsung | - |
| dc.contributor.author | Hwang, Ming-Hon | - |
| dc.date.accessioned | 2013-07-02T05:50:19Z | - |
| dc.date.available | 2013-07-02T05:50:19Z | - |
| dc.date.issued | 2013-07 | - |
| dc.identifier.issn | 0975-1084 (Online); 0022-4456 (Print) | - |
| dc.identifier.uri | http://hdl.handle.net/123456789/19402 | - |
| dc.description | 435-440 | en_US |
| dc.description.abstract | This study is concerned with the optimal common cycle time for a multi-item production system with discontinuous delivery and failure in rework. In real life manufacturing environments, managements often plan to produce multiple products in turn on a single machine in order to maximize machine utilization. Also, dealing with random defective items during production seems to be an inevitable task, and the multi-delivery policy is commonly adopted to distribute the finished products to buyers. The objective of this study is to determine the optimal common production cycle that minimizes the total production-inventory-delivery costs per unit time for a multi-item production system with failure in rework and multi-delivery policy. Mathematical modeling along with an optimization procedure is used to derive the optimal common cycle time for the aforementioned production problem. | en_US |
| dc.language.iso | en_US | en_US |
| dc.publisher | NISCAIR-CSIR, India | en_US |
| dc.rights | CC Attribution-Noncommercial-No Derivative Works 2.5 India | en_US |
| dc.source | JSIR Vol.72(07) [July 2013] | en_US |
| dc.subject | Multi-item production | en_US |
| dc.subject | Optimization | en_US |
| dc.subject | Common cycle time | en_US |
| dc.subject | Failure in rework | en_US |
| dc.subject | Scrap | en_US |
| dc.subject | Multi-shipment | en_US |
| dc.title | Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework | en_US |
| dc.type | Article | en_US |
| Appears in Collections: | JSIR Vol.72(07) [July 2013] | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| JSIR 72(7) 435-440.pdf | 265.6 kB | Adobe PDF | View/Open |
Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.