Please use this identifier to cite or link to this item: http://nopr.niscpr.res.in/handle/123456789/25136
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSingh, G-
dc.contributor.authorAngal-Kalinin, D-
dc.contributor.authorBhawalkar, D D-
dc.contributor.authorFakhri, A A-
dc.contributor.authorGhodke, A D-
dc.contributor.authorKant, Pradeep-
dc.contributor.authorKumar, Pradeep-
dc.contributor.authorNema, P K-
dc.contributor.authorRao, A S Raja-
dc.contributor.authorSahoo, G K-
dc.contributor.authorSingh, B-
dc.date.accessioned2013-12-27T07:04:19Z-
dc.date.available2013-12-27T07:04:19Z-
dc.date.issued2001-01-
dc.identifier.issn0975-1041 (Online); 0019-5596 (Print)-
dc.identifier.urihttp://hdl.handle.net/123456789/25136-
dc.description96-103en_US
dc.description.abstractThe Indus-1 synchrotron radiation facility consists of a 450 MeV storage ring for the production of V UV radiation and an injector system, which has a 20 MeV microtron and a synchrotron. This facility has been successfully commissioned in 1999. In the synchrotron, a current of 11 mA has been achieved at 450 MeV. Two out of three bunches from the  synchrotron have been successfully extracted and injected into Indus-1 storage ring. Maximum current of 161 mA was accumulated in the Indus-1 storage ring. Beam dynamics studies carried out on these machines during the commissioning are described in this paper.en_US
dc.language.isoen_USen_US
dc.publisherNISCAIR-CSIR, Indiaen_US
dc.rights CC Attribution-Noncommercial-No Derivative Works 2.5 Indiaen_US
dc.sourceIJPAP Vol.39(01-02) [January-February 2001]en_US
dc.titleCommissioning status of Indus-1 SR facilityen_US
dc.typeArticleen_US
Appears in Collections:IJPAP Vol.39(01-02) [January-February 2001]

Files in This Item:
File Description SizeFormat 
IJPAP 39(1-2) 96-103.pdf1.35 MBAdobe PDFView/Open


Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.