Please use this identifier to cite or link to this item:
http://nopr.niscpr.res.in/handle/123456789/29449Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Kumar, A | - |
| dc.contributor.author | Malik, S C | - |
| dc.date.accessioned | 2014-10-07T11:36:44Z | - |
| dc.date.available | 2014-10-07T11:36:44Z | - |
| dc.date.issued | 2014-10 | - |
| dc.identifier.issn | 0975-1084 (Online); 0022-4456 (Print) | - |
| dc.identifier.uri | http://hdl.handle.net/123456789/29449 | - |
| dc.description | 653-655 | en_US |
| dc.description.abstract | The emphasis of the present study is on the evaluation of reliability measures of a computer system with independent hardware (h/w) and software (s/w) failures. A single repair facility is provided immediately for conducting repair activities of h/w and s/w. Preventive maintenance of the system is done after a maximum operation time. Replacement of the h/w by new one is made in case server fails to complete its repair in a given maximum time. However, only replacement of the s/w is done by new one giving some replacement time. Priority is given to s/w replacement over h/w repair activities. The failure time distribution of the h/w and s/w follows negative exponential while the distributions of preventive maintenance, repair and replacement time are taken as arbitrary with different probability density functions. Illustration for a particular case is given to show the graphical behaviour of some important reliability measures. | en_US |
| dc.language.iso | en_US | en_US |
| dc.publisher | NISCAIR-CSIR, India | en_US |
| dc.rights | CC Attribution-Noncommercial-No Derivative Works 2.5 India | en_US |
| dc.source | JSIR Vol.73(10) [October 2014] | en_US |
| dc.subject | Computer System | en_US |
| dc.subject | Maximum Operation and Repair Times | en_US |
| dc.subject | Preventive Maintenance and Cost- Benefit Analysis | en_US |
| dc.title | Cost-Benefit Analysis of a Computer System with Priority to S/W Replacement over H/W Repair Activities Subject to Maximum Operation and Repair Times | en_US |
| dc.type | Article | en_US |
| Appears in Collections: | JSIR Vol.73(10) [October 2014] | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| JSIR 73(10) 653-655.pdf | 139.21 kB | Adobe PDF | View/Open |
Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.