Please use this identifier to cite or link to this item:
http://nopr.niscpr.res.in/handle/123456789/29737Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Bhattacharya, Debajit | - |
| dc.contributor.author | Ray, Lalitagauri | - |
| dc.contributor.author | Ghosh, Amit Kumar | - |
| dc.contributor.author | Chattopadhyay, Parimal | - |
| dc.date.accessioned | 2014-11-05T10:55:29Z | - |
| dc.date.available | 2014-11-05T10:55:29Z | - |
| dc.date.issued | 1997-10 | - |
| dc.identifier.issn | 0975-1017 (Online); 0971-4588 (Print) | - |
| dc.identifier.uri | http://hdl.handle.net/123456789/29737 | - |
| dc.description | 196-202 | en_US |
| dc.description.abstract | A continuous flow laboratory scale fluidised bed bioreactor (FBBR) was designed and operated for the treatment of synthetic dairy waste with average COD 520 mg/L. Mathematical models for FBBR for 90% COD removal and 25% COD removal were calculated" It was found that 23% COD removal was possible at a bed height of 8.0 cm which is very close to the theoretically calculated value, i.e., 25%.COD removal at a bed height of 9.6 cm. So a pilot plant construction is possible for 90% COD removal on the basis of theoretical calculations. | en_US |
| dc.language.iso | en_US | en_US |
| dc.publisher | NISCAIR-CSIR, India | en_US |
| dc.rights | CC Attribution-Noncommercial-No Derivative Works 2.5 India | en_US |
| dc.source | IJEMS Vol.04(5) [October 1997] | en_US |
| dc.title | Design and operation of a laboratory scale fluidised bed bioreactor for the treatment of synthetic dairy wastewater | en_US |
| dc.type | Article | en_US |
| Appears in Collections: | IJEMS Vol.04(5) [October 1997] | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| IJEMS 4(5) 196-202.pdf | 754.77 kB | Adobe PDF | View/Open |
Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.