Please use this identifier to cite or link to this item:
http://nopr.niscpr.res.in/handle/123456789/4326| Title: | Simultaneous job scheduling and tool replacement based on tool reliability byproposed Tabu-SA algorithm |
| Authors: | Kolahan, Farhad Sharifinya, Ahmad |
| Keywords: | Combinatorial optimization;Reliability;Scheduling;Tabu-SA algorithm;Tool replacement |
| Issue Date: | Jun-2009 |
| Publisher: | CSIR |
| Abstract: | This paper addresses integrated job scheduling and tool replacement problems in a single machine environment withobjectives to determine optimal job sequence, tool selection for operation, tool replacement schedule, and number of spares foreach tool type, in such a way that total expected production cost is minimized. Since problem is NP-hard, a hybrid algorithm[Tabu-simulated annealing (SA)] is proposed to simultaneously provide job sequencing, tool replacement intervals and number ofspare tools required. Tabu-SA is examined and results are compared by solving a real-sized example problem. |
| Page(s): | 496-504 |
| ISSN: | 0022-4456 |
| Appears in Collections: | JSIR Vol.68(06) [June 2009] |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| JSIR 68(6) 496-504.pdf | 132.54 kB | Adobe PDF | View/Open |
Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.