Please use this identifier to cite or link to this item: http://nopr.niscpr.res.in/handle/123456789/4329
Full metadata record
DC FieldValueLanguage
dc.contributor.authorChiu, Yuan-Shyi Peter-
dc.contributor.authorChiu, Singa Wang-
dc.contributor.authorLi, Chun-Yi-
dc.contributor.authorTing, Chia-Kuan-
dc.date.accessioned2009-05-26T12:31:12Z-
dc.date.available2009-05-26T12:31:12Z-
dc.date.issued2009-06-
dc.identifier.issn0022-4456-
dc.identifier.urihttp://hdl.handle.net/123456789/4329-
dc.description505-512en_US
dc.description.abstractThis paper incorporates a multi-delivery policy and quality assurance into an imperfect economic production quantity(EPQ) model with scrap and rework. A portion of nonconforming items produced is considered to be scrap, while other isassumed to be repairable and is reworked in each cycle when regular production ends. Finished items can only be delivered tocustomers if whole lot is quality assured after rework. Fixed quantity multiple installments of finished batch are delivered byrequest to customers at a fixed interval of time. Expected integrated cost function per unit time is derived. A closed-form optimalbatch size solution to the problem is obtained. Two special cases are examined and a numerical example given to demonstratemodel’s practical usage.en_US
dc.language.isoen_USen_US
dc.publisherCSIRen_US
dc.sourceJSIR Vol.68(06) [June 2009]en_US
dc.subjectEPQ modelen_US
dc.subjectLot sizingen_US
dc.subjectMultiple deliveriesen_US
dc.subjectProductionen_US
dc.subjectReworken_US
dc.subjectScrapen_US
dc.titleIncorporating multi-delivery policy and quality assurance into economic productionlot size problemen_US
dc.typeArticleen_US
Appears in Collections:JSIR Vol.68(06) [June 2009]

Files in This Item:
File Description SizeFormat 
JSIR 68(6) 505-512.pdf514.8 kBAdobe PDFView/Open


Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.