Please use this identifier to cite or link to this item: http://nopr.niscpr.res.in/handle/123456789/4847
Full metadata record
DC FieldValueLanguage
dc.contributor.authorChiu, Singa Wang-
dc.contributor.authorChiu, Yuan-Shyi Peter-
dc.date.accessioned2009-06-26T05:33:11Z-
dc.date.available2009-06-26T05:33:11Z-
dc.date.issued2006-06-
dc.identifier.issn0975-1084 (Online); 0022-4456 (Print)-
dc.identifier.urihttp://hdl.handle.net/123456789/4847-
dc.description499-506en_US
dc.description.abstractThis paper employs mathematical modeling to derive the optimal lot size for economic production quantity model with random defective rate, imperfect rework process, and backlogging. In real life manufacturing process, the generation of defective items is inevitable. In this study, random defective rate is assumed and all defective items are reworked when regular production ends. During the rework process, a random portion of reworked items fails and becomes scrap. Disposal and repair costs are included in the proposed mathematical modeling and analysis. The optimal production lot size and backordering level that minimize overall production costs are derived. Numerical example is provided to demonstrate its practical usage.en_US
dc.language.isoen_USen_US
dc.publisherCSIRen_US
dc.sourceJSIR Vol.65(06) [June 2006]en_US
dc.subjectFailure in repairen_US
dc.subjectFinite production rate modelen_US
dc.subjectInventoryen_US
dc.subjectOptimal lot sizeen_US
dc.subjectReworken_US
dc.titleMathematical modeling for production system with backlogging and failure in repairen_US
dc.typeArticleen_US
Appears in Collections:JSIR Vol.65(06) [June 2006]

Files in This Item:
File Description SizeFormat 
JSIR 65(6) 499-506.pdf196.49 kBAdobe PDFView/Open


Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.