Please use this identifier to cite or link to this item: http://nopr.niscpr.res.in/handle/123456789/4992
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMouli, K V V Chandra-
dc.contributor.authorSubbaiah, K Venkata-
dc.contributor.authorAcharyulu, S G-
dc.date.accessioned2009-06-30T03:40:42Z-
dc.date.available2009-06-30T03:40:42Z-
dc.date.issued2006-12-
dc.identifier.issn0975-1084 (Online); 0022-4456 (Print)-
dc.identifier.urihttp://hdl.handle.net/123456789/4992-
dc.description966-969en_US
dc.description.abstractProduction planning is meant to arrive at the framework of manufacturing operations during the period planned. This paper addresses the solution for finding an optimal production planning to minimize the total cost under the resource constraints taking overtime and subcontracting costs. A mathematical model is formulated and Genetic algorithms are implemented in constrained optimization to arrive an optimal solution.en_US
dc.language.isoen_USen_US
dc.publisherCSIRen_US
dc.sourceJSIR Vol.65(12) [December 2006]en_US
dc.subjectGenetic algorithmsen_US
dc.subjectProduction planningen_US
dc.subjectTransportation problemen_US
dc.titleOptimal production planning under resource constraintsen_US
dc.typeArticleen_US
Appears in Collections:JSIR Vol.65(12) [December 2006]

Files in This Item:
File Description SizeFormat 
JSIR 65(12) 966-969.pdf66.81 kBAdobe PDFView/Open


Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.