Please use this identifier to cite or link to this item: http://nopr.niscpr.res.in/handle/123456789/5000
Full metadata record
DC FieldValueLanguage
dc.contributor.authorErdem, Bulent-
dc.contributor.authorDuzgun, H Sebnem Baskan-
dc.date.accessioned2009-06-30T03:56:54Z-
dc.date.available2009-06-30T03:56:54Z-
dc.date.issued2005-01-
dc.identifier.issn0975-1084 (Online); 0022-4456 (Print)-
dc.identifier.urihttp://hdl.handle.net/123456789/5000-
dc.description19-29en_US
dc.description.abstractDraglines operate in a cyclic nature. Excluding the infrequent walking, a dragline spends its major operational time by digging the dirt and paying it out on a spoil pile. Considering the fact that a dragline performs tens of thousands of cycles per year, it is evident that even a small reduction in a single cycle time would result in a significant increase in productivity. Thus, it is to the benefit of a mine that dragline cycles need to be critically analyzed and corrective measures be taken. Although there exist different opinions on what segments constitute a dragline cycle, in this study it is accepted that a dragline cycle is composed of the following phases: (i) Filling the bucket by dragging it towards the dragline; (ii) Swinging the loaded bucket along a predetermined arc; (iii) Paying out the dirt onto a spoil pile; (iv) Swinging the empty bucket back to excavation face; and (v) Positioning the bucket to re-load. The study is based on field investigation conducted on six draglines with different capacities and operating modes. Stopwatch study is performed. Influence of cut dimensions, nature of material excavated, mode of digging, type of bucket employed, swing angle, operators’ judgements and condition of dragline on cycle time are analyzed. The results are presented by tabular data and illustrations.en_US
dc.language.isoen_USen_US
dc.publisherCSIRen_US
dc.relation.ispartofseriesE 02 F 3/48en_US
dc.sourceJSIR Vol.64(01) [January 2005]en_US
dc.subjectCycle timeen_US
dc.subjectDraglineen_US
dc.subjectDrag-dependencyen_US
dc.subjectHoist-dependencyen_US
dc.subjectSwing-dependencyen_US
dc.titleDragline cycle time analysisen_US
dc.typeArticleen_US
Appears in Collections:JSIR Vol.64(01) [January 2005]

Files in This Item:
File Description SizeFormat 
JSIR 64(1) 19-29.pdf575.14 kBAdobe PDFView/Open


Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.