Please use this identifier to cite or link to this item: http://nopr.niscpr.res.in/handle/123456789/64842
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBarve, Purushottam S-
dc.contributor.authorDeshpande, Yogesh V-
dc.contributor.authorZanwar, D R-
dc.contributor.authorBhoyar, Sunil-
dc.contributor.authorPund, S S-
dc.date.accessioned2024-11-08T06:43:34Z-
dc.date.available2024-11-08T06:43:34Z-
dc.date.issued2024-11-
dc.identifier.issn0022-4456 (Print); 0975-1084 (Online)-
dc.identifier.urihttp://nopr.niscpr.res.in/handle/123456789/64842-
dc.description1172-1183en_US
dc.description.abstractManufacturing fuse bodies for defence applications demand precision and efficiency, posing challenges due to the complexity of machining operations. This study proposes a novel fixture design to address these challenges on vertical machining center. The study highlights the practical utility of tailored fixture designs in defence manufacturing, offering a replicable framework for productivity enhancement. Two fixture types were modelled using SolidWorks, with the Type-B fixture selected for its superior production capabilities. The study focuses on a specialized Type-B fixture design for fuse body machining, supported by rigorous analysis and testing, distinguishes it and underscores its potential impact on defence manufacturing processes. ANSYS software, stress, strain, and deformation analysis guided the design and simulation process. The novel Type-B fixture reduced entire manufacturing time to 5.41 minutes per part, 33.76% quicker than conventional methods, resulting in a 34.02% increase in production rate (77 parts/shift). This research concludes critical efficiency concerns in defence manufacturing, offering a practical solution to improve productivity while maintaining quality standards. This research highlights the fixture's potential towards significant improvements in productivity and operational efficiency. The detailed comparison of performance of existing manufacturing process with the process using Type-B fixture is presented in this study.en_US
dc.language.isoenen_US
dc.publisherNIScPR-CSIR, Indiaen_US
dc.sourceJSIR Vol.83(11) [November 2024]en_US
dc.subjectANSYSen_US
dc.subjectFuse bodyen_US
dc.subjectNovel Type-B fixtureen_US
dc.subjectProductivity improvementen_US
dc.subjectVertical machining centeren_US
dc.titleDevelopment of an Innovative Assembly Fixture for Machining Synchronization of Multi Fuse Parts on Vertical Machining Center and Productivity Enhancementen_US
dc.typeArticleen_US
dc.identifier.doihttps://doi.org/10.56042/jsir.v83i11.7562en_US
Appears in Collections:JSIR Vol.83(11) [November 2024]

Files in This Item:
File Description SizeFormat 
JSIR 83(11) 1172-1183.pdf1.92 MBAdobe PDFView/Open


Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.