Please use this identifier to cite or link to this item: http://nopr.niscpr.res.in/handle/123456789/755
Full metadata record
DC FieldValueLanguage
dc.contributor.authorChiu, Yuan-Shyi Peter-
dc.contributor.authorChiu, Singa Wang-
dc.contributor.authorChao, Huang-Chieh-
dc.date.accessioned2008-04-04T11:11:22Z-
dc.date.available2008-04-04T11:11:22Z-
dc.date.issued2008-02-
dc.identifier.issn0022-4456-
dc.identifier.urihttp://hdl.handle.net/123456789/755-
dc.description112-116en_US
dc.description.abstractLong run average costs for finite production rate model with backlogging is less than or equal to that of the same model without backlogging. An equation for calculating intangible backorder cost is proposed for situation when required service level is not attainable. By incorporating this intangible backorder cost in mathematical analysis, one can derive a new optimal lot-size policy that minimizes expected total costs as well as satisfies the shortage level constraint.en_US
dc.language.isoen_USen_US
dc.publisherCSIRen_US
dc.sourceJSIR Vol.67(2) [February 2008]en_US
dc.subjectDefectsen_US
dc.subjectFinite production rateen_US
dc.subjectManufacturingen_US
dc.subjectReworken_US
dc.subjectScrapen_US
dc.subjectShortage level constrainten_US
dc.titleEffect of shortage level constraint on finite production rate model with reworken_US
dc.typeArticleen_US
Appears in Collections:JSIR Vol.67(02) [February 2008]

Files in This Item:
File Description SizeFormat 
JSIR 67(2) (2008) 112-116.pdf117.05 kBAdobe PDFView/Open


Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.