Please use this identifier to cite or link to this item:
http://nopr.niscpr.res.in/handle/123456789/19402| Title: | Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework |
| Authors: | Chiu, Yuan-Shyi Peter Lin, Hong-Dar Cheng, Feng-Tsung Hwang, Ming-Hon |
| Keywords: | Multi-item production;Optimization;Common cycle time;Failure in rework;Scrap;Multi-shipment |
| Issue Date: | Jul-2013 |
| Publisher: | NISCAIR-CSIR, India |
| Abstract: | This study is concerned with the optimal common cycle time for a multi-item production system with discontinuous delivery and failure in rework. In real life manufacturing environments, managements often plan to produce multiple products in turn on a single machine in order to maximize machine utilization. Also, dealing with random defective items during production seems to be an inevitable task, and the multi-delivery policy is commonly adopted to distribute the finished products to buyers. The objective of this study is to determine the optimal common production cycle that minimizes the total production-inventory-delivery costs per unit time for a multi-item production system with failure in rework and multi-delivery policy. Mathematical modeling along with an optimization procedure is used to derive the optimal common cycle time for the aforementioned production problem. |
| Page(s): | 435-440 |
| ISSN: | 0975-1084 (Online); 0022-4456 (Print) |
| Appears in Collections: | JSIR Vol.72(07) [July 2013] |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| JSIR 72(7) 435-440.pdf | 265.6 kB | Adobe PDF | View/Open |
Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.