Title: Commissioning status of Indus-1 SR facility
Authors: Singh, G
Angal-Kalinin, D
Bhawalkar, D D
Fakhri, A A
Ghodke, A D
Kant, Pradeep
Kumar, Pradeep
Nema, P K
Rao, A S Raja
Sahoo, G K
Singh, B
Issue Date: Jan-2001
Publisher: NISCAIR-CSIR, India
Abstract: The Indus-1 synchrotron radiation facility consists of a 450 MeV storage ring for the production of V UV radiation and an injector system, which has a 20 MeV microtron and a synchrotron. This facility has been successfully commissioned in 1999. In the synchrotron, a current of 11 mA has been achieved at 450 MeV. Two out of three bunches from the  synchrotron have been successfully extracted and injected into Indus-1 storage ring. Maximum current of 161 mA was accumulated in the Indus-1 storage ring. Beam dynamics studies carried out on these machines during the commissioning are described in this paper.
Page(s): 96-103
ISSN: 0975-1041 (Online); 0019-5596 (Print)
Appears in Collections:IJPAP Vol.39(01-02) [January-February 2001]

Files in This Item:
File Description SizeFormat 
IJPAP 39(1-2) 96-103.pdf1.35 MBAdobe PDFView/Open


Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.