http://nopr.niscpr.res.in/handle/123456789/25136| Title: | Commissioning status of Indus-1 SR facility |
| Authors: | Singh, G Angal-Kalinin, D Bhawalkar, D D Fakhri, A A Ghodke, A D Kant, Pradeep Kumar, Pradeep Nema, P K Rao, A S Raja Sahoo, G K Singh, B |
| Issue Date: | Jan-2001 |
| Publisher: | NISCAIR-CSIR, India |
| Abstract: | The Indus-1 synchrotron radiation facility consists of a 450 MeV storage ring for the production of V UV radiation and an injector system, which has a 20 MeV microtron and a synchrotron. This facility has been successfully commissioned in 1999. In the synchrotron, a current of 11 mA has been achieved at 450 MeV. Two out of three bunches from the synchrotron have been successfully extracted and injected into Indus-1 storage ring. Maximum current of 161 mA was accumulated in the Indus-1 storage ring. Beam dynamics studies carried out on these machines during the commissioning are described in this paper. |
| Page(s): | 96-103 |
| ISSN: | 0975-1041 (Online); 0019-5596 (Print) |
| Appears in Collections: | IJPAP Vol.39(01-02) [January-February 2001] |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| IJPAP 39(1-2) 96-103.pdf | 1.35 MB | Adobe PDF | View/Open |
Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.