Please use this identifier to cite or link to this item:
http://nopr.niscpr.res.in/handle/123456789/29449| Title: | Cost-Benefit Analysis of a Computer System with Priority to S/W Replacement over H/W Repair Activities Subject to Maximum Operation and Repair Times |
| Authors: | Kumar, A Malik, S C |
| Keywords: | Computer System;Maximum Operation and Repair Times;Preventive Maintenance and Cost- Benefit Analysis |
| Issue Date: | Oct-2014 |
| Publisher: | NISCAIR-CSIR, India |
| Abstract: | The emphasis of the present study is on the evaluation of reliability measures of a computer system with independent hardware (h/w) and software (s/w) failures. A single repair facility is provided immediately for conducting repair activities of h/w and s/w. Preventive maintenance of the system is done after a maximum operation time. Replacement of the h/w by new one is made in case server fails to complete its repair in a given maximum time. However, only replacement of the s/w is done by new one giving some replacement time. Priority is given to s/w replacement over h/w repair activities. The failure time distribution of the h/w and s/w follows negative exponential while the distributions of preventive maintenance, repair and replacement time are taken as arbitrary with different probability density functions. Illustration for a particular case is given to show the graphical behaviour of some important reliability measures. |
| Page(s): | 653-655 |
| ISSN: | 0975-1084 (Online); 0022-4456 (Print) |
| Appears in Collections: | JSIR Vol.73(10) [October 2014] |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| JSIR 73(10) 653-655.pdf | 139.21 kB | Adobe PDF | View/Open |
Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.