Please use this identifier to cite or link to this item:
http://nopr.niscpr.res.in/handle/123456789/4992| Title: | Optimal production planning under resource constraints |
| Authors: | Mouli, K V V Chandra Subbaiah, K Venkata Acharyulu, S G |
| Keywords: | Genetic algorithms;Production planning;Transportation problem |
| Issue Date: | Dec-2006 |
| Publisher: | CSIR |
| Abstract: | Production planning is meant to arrive at the framework of manufacturing operations during the period planned. This paper addresses the solution for finding an optimal production planning to minimize the total cost under the resource constraints taking overtime and subcontracting costs. A mathematical model is formulated and Genetic algorithms are implemented in constrained optimization to arrive an optimal solution. |
| Page(s): | 966-969 |
| ISSN: | 0975-1084 (Online); 0022-4456 (Print) |
| Appears in Collections: | JSIR Vol.65(12) [December 2006] |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| JSIR 65(12) 966-969.pdf | 66.81 kB | Adobe PDF | View/Open |
Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.