Please use this identifier to cite or link to this item: http://nopr.niscpr.res.in/handle/123456789/738
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKaushik, Prabhakar-
dc.contributor.authorKhanduja, Dinesh-
dc.date.accessioned2008-04-04T09:28:38Z-
dc.date.available2008-04-04T09:28:38Z-
dc.date.issued2008-01-
dc.identifier.issn0022-4456-
dc.identifier.urihttp://hdl.handle.net/123456789/738-
dc.description36-42en_US
dc.description.abstractSix Sigma DMAIC (define, measure, analysis, improve, control) methodology has been applied to a process industry seeking energy conservation, taking a specific case of a thermal power plant. DM (De-mineralize) water in these plants is an expensive input material. It has been found that 0.1% increase in DM make up water consumption increases generation cost by Rs 82.82 lakhs per annum. In present study, implementation of Six Sigma project recommendations brought down mean make up water from 0.90% to 0.54% of MCR (Maximum Continuous Rating), accruing with it a comprehensive energy savings of nearly Rs 304.77 lakhs per annum.en_US
dc.language.isoen_USen_US
dc.publisherCSIRen_US
dc.sourceJSIR Vol.67(1) [January 2008]en_US
dc.subjectCTQen_US
dc.subjectDMen_US
dc.subjectDMAICen_US
dc.subjectProcess industryen_US
dc.subjectSix Sigmaen_US
dc.titleDM make up water reduction in thermal power plants using Six Sigma DMAIC methodologyen_US
dc.typeArticleen_US
Appears in Collections:JSIR Vol.67(01) [January 2008]

Files in This Item:
File Description SizeFormat 
JSIR 67(1) (2008) 36-42.pdf303.44 kBAdobe PDFView/Open


Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.