Please use this identifier to cite or link to this item:
http://nopr.niscpr.res.in/handle/123456789/738| Title: | DM make up water reduction in thermal power plants using Six Sigma DMAIC methodology |
| Authors: | Kaushik, Prabhakar Khanduja, Dinesh |
| Keywords: | CTQ;DM;DMAIC;Process industry;Six Sigma |
| Issue Date: | Jan-2008 |
| Publisher: | CSIR |
| Abstract: | Six Sigma DMAIC (define, measure, analysis, improve, control) methodology has been applied to a process industry seeking energy conservation, taking a specific case of a thermal power plant. DM (De-mineralize) water in these plants is an expensive input material. It has been found that 0.1% increase in DM make up water consumption increases generation cost by Rs 82.82 lakhs per annum. In present study, implementation of Six Sigma project recommendations brought down mean make up water from 0.90% to 0.54% of MCR (Maximum Continuous Rating), accruing with it a comprehensive energy savings of nearly Rs 304.77 lakhs per annum. |
| Page(s): | 36-42 |
| ISSN: | 0022-4456 |
| Appears in Collections: | JSIR Vol.67(01) [January 2008] |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| JSIR 67(1) (2008) 36-42.pdf | 303.44 kB | Adobe PDF | View/Open |
Items in NOPR are protected by copyright, with all rights reserved, unless otherwise indicated.